Signage & print

Construction signage that communicates clearly from site gate to handover

Purple Frog Signs supplies construction site boards, health-and-safety information, branded hoarding, development marketing, directional signs and handover graphics. We plan for changing information, site access, programme dependencies and the conditions in which the signs will be used. The scope can cover active-site needs, development promotion and permanent handover.

Available for projects across Kent, London, Surrey, Sussex, Essex and the wider South East.

Chris Wakelin with Hoarding
Built around the settingSpecified for the expected lifespanApproved before production

Sign types

Formats covered on this page

  1. Hoarding and construction signage

    Site information, safety panels and large-format boundary graphics planned around changing content, access and installation conditions.

Hoarding as communication, not wallpaper

A long hoarding run should be planned as a sequence. Brand recognition, project information, visual rhythm, entrances, corners, viewing distances and panel joins all matter. Artwork should use the surveyed panel schedule, not an assumed continuous canvas.

Before printing, confirm the substrate, panel condition, dimensions, fixing method, access, edge details and whether graphics are direct-applied, mounted as panels or part of a reusable system.

Control of changing safety information

The client or duty holder must provide and approve the required safety content. Purple Frog Signs can design for clarity and produce the signs, but signage does not replace a risk assessment, site controls or competent health-and-safety advice. Date-sensitive or phase-specific information should use a managed update process.

Installation planning

Site installations may require induction, PPE, escorts, booked delivery slots, permits, access equipment and coordination with other trades. Final RAMS should reflect the actual site and agreed method.

Project details that help us quote

Send the site postcode, photographs, approximate dimensions, quantity, required wording, brand files, preferred timescale and whether you need design, removal, delivery or installation. It is fine if the material or construction is not yet decided.

Material guide

Common materials, explained clearly

These visual guides show common material characteristics rather than completed Purple Frog Signs projects. The final specification still depends on location, construction, lifespan, finish and fixing method.

illustration of ACM

ACM / aluminium composite material

A rigid, stable panel commonly used for flat signs and trays. Different grades and finishes are available; suitability depends on the construction and environment.

illustration of foamex

Foamex / expanded PVC sheet

A lightweight, smooth-faced board often used for indoor displays and suitable shorter-term applications. Thickness and use must be matched to the installation.

Illustration of vinyl and printable films

Vinyl and printable films

A broad family of materials used for lettering, windows, walls, panels and vehicles. Adhesive, conformability, opacity, finish and removability vary significantly.

Banner materials and mesh

Flexible printed media for temporary or event use. Mesh can help manage wind load in exposed positions, but the supporting structure and fixing method still matter.

Useful answers

Questions people often ask

Clear answers to the practical details that can affect a project.

Read all frequently asked questions
Can you update individual hoarding panels when the project changes?

Yes, provided the panel schedule and artwork system allow sections to be replaced cleanly. Retain source files and panel references for controlled updates.

Can you work from an agency’s campaign artwork?

Yes. We check scale, resolution, bleed, panel splits, safe areas, brand colours and installation details before production.

Do you supply temporary directional signs?

Yes. The construction and fixing should still be selected for the exposure, location, duration and risk of movement or obstruction.

Can you install while the site is operational?

Yes, where the principal contractor approves the method, access and programme. Site rules and sequencing must be supplied before attendance.

Related case studies
Explore all Case Studies & News
A useful next step

Keep the site clear, consistent and ready for its next phase